120+ projects
delivered.
Zero compromise.
Your Business is a UAE construction firm. We design, permit, and build residential, commercial and civil work — to the brief, on the schedule, and signed off the first time. Boring on purpose.
Tower fit-out, Business Bay
ActiveSix disciplines,
one general contractor.
A self-performing team across structure, finishes and MEP. We act as main contractor on most projects and as design-build partner where the brief calls for it.
Residential villas
Bespoke villas and townhouses across Emirates Hills, Al Barari, MBR City and Saadiyat. Design-build or build-only against an architect of record.
- Design-build
- Landscape
- Pool & MEP
Commercial build
Mid-rise offices, retail anchors and mixed-use base-build. We work directly with developers and lead trades — concrete, cladding, vertical transport.
- Base-build
- Cladding
- Concrete frame
Fit-out (Cat-A & B)
Office, F&B and clinic fit-out. From shell handover to occupancy in eight to fourteen weeks, depending on scope. Coordinated to landlord standards.
- Cat-A
- Cat-B
- F&B kitchens
Civil & infrastructure
Roads, retaining works, foundations and site formation. We mobilise our own plant and surveying crews — no subcontracting of the critical path.
- Earthworks
- Foundations
- Drainage
Retrofit & refurbishment
Phased retrofit of occupied buildings — façade, MEP, life-safety and structural strengthening. Night and weekend works where the asset cannot close.
- Façade
- Life-safety
- Phased delivery
MEP & commissioning
In-house mechanical, electrical and plumbing teams. Commissioning runs in parallel with finishes — every system handed over with a tested certificate.
- HVAC
- Electrical
- Plumbing
A selection,
recently delivered.
Six projects from the last 36 months. We list scope, area and the year of handover. References are available on request after a signed NDA.
Project name · 2024
Project name · 2025
Project name · 2023
Project name · 2023
Project name · 2024
Five stages,
one accountable team.
From the first walk-through to handover, the same project director stays on the file. No silent handoffs, no swapped teams mid-build.
Consult & brief
Site visit, scope discovery and a written feasibility note. We tell you what is buildable, on which budget, in which window.
Design & cost
Concept to IFC drawings with a fixed bill of quantities. Value-engineered against the brief — never against the spec.
Permit & mobilise
Authority approvals, site setup, plant on the ground. Owner sees a single permit dashboard with status and dates.
Build & report
Daily logs, weekly progress reports, monthly cost-to-complete. Trades sequenced against a baseline programme.
Handover & close
Snag list, commissioning certificates, as-built drawings and a one-year defects window. Operations & maintenance pack issued at sign-off.
Licensed,
insured, certified.
Independently audited every twelve months. Full trade licensing, ISO management systems and an in-house QHSE function with a dedicated safety officer on every active site.
UAE economic department · contracting category. Renewed annually, public record.
Quality management system, externally audited. Certificate available on request.
Occupational health and safety. Zero lost-time incidents, last 24 months of operation.
Professional indemnity and workers compensation, current to 2026. Certificates on file.
The people
who own the schedule.
A small leadership team you will actually meet. The principal signs off on every project director assignment, and the project director signs off on every handover.
Your Name
Twenty years across structure and base-build. Owns the client relationship from day one and the handover certificate at the end.
Your Name
Programme, cost and trade coordination. Runs the weekly client report and the cost-to-complete review on every active project.
Your Name
Quality, safety and authority approvals. Sits on every site walkdown and signs off the snag list before the project closes.
Start a brief,
or send an RFP.
Tell us the project type, the scope and the window. We reply within one working day with either a feasibility note or a no — both signed by a director.